Abstract

Objective: To explore the sound insulation, sound absorption and other noise reduction transformation methods in a noise workshop handover control room. Methods: In December 2021, through the occupational health investigation and on-site testing of the handover control room of a noise workshop, the causes of excessive noise were analyzed, and the transformation design scheme to reduce noise was proposed and the effect was analyzed. Results: Before the transformation, the peak frequency band noise intensity of the noise workshop handover control room was 112.8 dB (A), and the peak frequency was 1000 Hz. After noise reduction, the theoretical calculated control value was 61.0 dB (A), and the measured noise intensity was 59.8 dB (A) . Conclusion: The noise intensity of the handover control room is reduced after noise reduction, which is in line with the contact limit requirements of the control room in GBZ 1-2010 "Hygienic Standards for the Design of Industrial Enterprises", and has reference significance for noise control engineering.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.