Abstract

Abstract Multiple spurious operations (MSOs) mean multiple fire induced circuit faults causing an undesired operation of one or more systems or components. The Nuclear Energy Institute (NEI) of the United States published NEI 00-01 as guidelines for solving MSOs. And this guideline includes MSO scenarios of pressurized water reactor (PWR) and boiling water reactor (BWR). Nuclear power plant operators in U.S. analyzed MSOs under MSO scenarios included in NEI 00-01 and operators of PWRs in Korea also analyzed MSOs under the scenarios of NEI 00-01. As there are no pressurized heavy water reactors (PHWRs) in the United States, MSO scenarios of PHWRs are not included in the NEI 00-01 and any feasible scenarios have not been developed. This paper developed MSO scenarios which can be applied to PHWRs by reviewing the 63 MSO scenarios included in NEI 00-01. This study found that seven scenarios out of the 63 MSO scenarios can be applied and three more scenarios need to be developed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.