Abstract
Soft soil foundation treatment methods mainly include soil replacement cushion method, dynamic compaction method, drainage consolidation method, etc. Drainage consolidation methods mainly include: vacuum preloading method, stack preloading method and vacuum combined stacking preloading method. Among them, the vacuum preloading method has obvious advantages in treating large areas and deep soft foundations. This paper describes the process of soft soil foundation vacuum combined with stack preloading reinforcement. Through the monitoring of the vacuum preloading process, we mainly analyzed the monitoring results and development trend of horizontal displacement.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.