Abstract

Protection of distribution system against the lightning is performed by installing overhead ground wires over the phase conductors. This paper analyzes the lightning overvoltage by direct lightning according to the location of overhead ground wires in Korea distribution system. The distribution system is modeled by using EMTP/ATPDraw. The lightning overvoltage is calculated by EMTP/MODELS. In this paper, the overhead ground wires are installed at the various heights in the 22.9kV distribution system. The simulations are performed by changing the location of overhead ground wires and the simulation results are analyzed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.