Abstract

This paper is intended to describe an Italian case study of a microtunnelling project where the boring machine got stuck during jacking of a 760 mm pipe in a limestone formation. Reference is made to rock mass characterisation, including site investigations and laboratory tests. The machine’s performance is compared to prediction. To allow for a better understanding of the conditions which led to the unexpectedly high jacking forces, continuum and discontinuum numerical analyses have been used. These analyses are shown to be essential at the design stage, when dealing with microtunnelling in a rock mass, in order to obtain a good prediction of the jacking forces.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.