Abstract

Nuclear Regulatory Commission (NRC) regulations require inspection (ISI) of boiling or pressurized water-cooled nuclear power plants be performed in accordance with a referenced edition and addenda of Section XI, ``Rules for Inservice Inspection of Nuclear Power Plant components,`` of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code. The regulations permit licensees to request relief from the NRC from specific ASME Code requirements that are determined to be impractical for the specific licensee. The NRC evaluates these requests and may grant such relief, but the NRC may also impose alternative or augmented inspections to assure structural reliability. The purpose,of this task was to evaluate the basis for ISI nondestructive examination (NDE) relief requests and to evaluate the effect of proposed ASME Code changes that would reduce the need for such requests or provide for more complete information in relief requests. This report contains the results of an analysis of an ISI relief request data base that has been expanded to include 1195 ISI relief requests versus the 296 relief requests covered in the first report in April 1987, EGG-SD-7430. Also relief requests were added to the data base which came from both first and second 10-year inspection intervals for several facilities. This provided the means to analyze the effect of recently approved ASME Code cases and updated Code requirements, some of which have been published as a result of earlier work on this task.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call