Abstract

Relying on the physical projects of Guangdong Province Chaohui expressway, Wushen expressway Renbo Section and Foqingcong expressway, based on asphalt and asphalt mixture test and on-site SFC test detection, through mathematical statistics, the factors affecting the skid resistance of SMA-13 asphalt mixture are obtained. At the same time, based on the observation of anti-skid performance of SMA-13 asphalt pavement from one year after construction to one year after opening to traffic, the change law of anti-skid performance of SMA-13 asphalt pavement from post-construction, temporary pass, acceptance and opening to traffic is obtained. The research results show that factors such as asphalt binder, mineral aggregate synthesis gradation, different oil-stone ratios and aggregate processing technology are possible factors that affect the anti-skid performance of SMA-13. The early anti-skid performance of SMA-13 asphalt pavement usually cannot meet the acceptance standard of SFC=54. However, the SMA pavement after construction can be spread with 3∼5mm gravel to improve its early anti-skid performance, and the on-site treatment effect is better.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call