Abstract

Based on a certain loess tunnel in Kelan-Linxian Expressway in Shanxi province, the influence to primary support forces by different stress release is analyzed by the Ansys FE software in the step method excavation. The analysis results can reasonably reflect the actual case of primary support forces, and can offer related reference to the selection of reasonable design parameters for primary support.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.