Abstract

Numerical analysis is executed to deep foundation pit by using the finite element software. In combination with the site data, the consequences with the consideration of groundwater seepage are contrasted to the consequences without the consideration of groundwater seepage including the stability of the foundation pit. The analysis indicates that the result with the consideration of seepage is relatively close to the site data. Compared with the result without consideration of groundwater seepage, the maximum horizontal offset of the pile increases approximate 5mm and the location of the maximum horizontal displacement moves 2m down. So seepage is harmful to the retaining structure of foundation pit and should be considered in the design of foundation pit.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.