Abstract

In order to study the influence of cement-soil mixing pile arrangement in soft-soil foundation treatment on frame seawall, this paper took Wenzhou Lingkun seawall project as an example to analyze the effective cement-soil mixing pile length and spacing based on Midas GTS finite element analysis. The results turn out that the optimal cement-soil mixing pile length was 15~20m and the optimal pile spacing was 2.5 to 3 times the pile diameter on soft-soil foundation treatment.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call