Abstract

A three-dimensional geological model of Goaf is established, and the finite element analysis of Goaf deformation is carried out by using the analysis module of construction stage in Midas/GTS 2.6. The stability of the tower is demonstrated with the deformation monitoring results, and the estimated cost of route modification is saved, the optimized route has accumulated experience for transmission line engineering construction in Goaf.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call