Abstract

Difficult and complex geological conditions are often an obstacle to the efficient implementation of construction works related to the erection of objects, in particular, earthworks and foundations. In the event of an additional occurrence of adverse weather conditions, there may be a delay in the final effect of the work and exceeding the construction costs. The article presents the stage of the implementation case in which these factors were compiled. The SWOT analysis was an element helpful in analyzing the situation and also allowing to make decisions regarding implementation. Through this analysis, the contractor identified the possible activities, including opportunities and strengths, which allowed for the development of a scenario. This is important because the lack of action would cause even greater delays and financial losses than those already existing.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.