Abstract

This paper introduces the total heating capacity, total installed capacity, heating area change trend and unit transformation of direct regulating heating units in Shandong power grid in recent years. According to the operation data of condensing pumping units, back pressure heating units and cylinder cutting units in previous heating seasons, the heating and peak shaving performance of different types of cogeneration units of the same type, grade and grade in heating seasons are analyzed, It is convenient for the power grid dispatching department to more reasonably and orderly arrange the unit mediation plan of the province's thermal power plants according to the online situation of new energy and external power. At the same time, it is a reference for power generation enterprises to carry out flexible transformation according to the actual situation of units during the 14th Five Year Plan period, and take into account the low load peak shaving performance of units or the whole plant while increasing heating capacity.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call