Abstract

In accordance with the requirements of Technical guidelines for environmental impact assessment―groundwater environment (HJ 610-2016), the process of groundwater environmental impact assessment and prediction was analyzed. Groundwater Model System (GMS) was used to simulate Groundwater flow field and solute transport, the following main conclusions were draw. As long as the project conforms to the specifications and design and the management is in place during operation, the production area and tailings area in normal working conditions will not cause obvious adverse effects on the quality of groundwater. Under different assumptions, groundwater pollution of the production area and tailings area in abnormal conditions will not directly affect the drinking water, farmland irrigation water and surface water of surrounding residents.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call