Abstract

Automatic Depressurization System (ADS) is a very important part of passive core cooling system in passive safety nuclear plant AP1000. ADS have four stages with each stage having two series and only ADS4 utilizes squib valves. During the accident, emergency core injecting is realized by gravity driven passive safety injection system like makeup tank (CMT), accumulator and In-Containment Refueling Water Storage Tank (IRWST). The objective e of this study is to analyze the system response and phenomenon under part of failure of ADS in AP1000 LOCA. The plant model is built by using SCDAP/RELAP5/MOD 3.4 code. The chosen accident scenario is small and medium LOCAs followed by failure of ADS4 to open, whose location is different from the other three stages. The results indicate that long time core cooling from IRWST is postponed greatly through intentional depressurization only by ADS1, 2, 3. In addition, LOCAs with equivalent diameter 25.4 cm and 34.1 cm will not lead to core melt while 5.08 cm break LOCA will. Meanwhile, high water level in the pressurizer will appear during all of three LOCAs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.