Abstract

The development of science and technology must be followed by an increase in the quality of quality Human Resources (HR), who think and act practically and efficiently. It is expected that quality Human Resources (HR) can be born from Universities in Indonesia. Surabaya State University is one of the institutions for the study and development of science, which plays a role in preparing professional workers. Not only equipping students with theoretical knowledge alone, but also equipped with practicums and internship activities as a means of training and skills for various fields according to the majors of each student. Internship Work Practice aims for students to be able to distinguish between the theory obtained in the lecture hall and field work practice, and to be able to think critically, logically, conceptually and applicatively as well as professionally in their fields. In this case, in the Building Engineering Education Study Program, Internship Work Practice is one of the requirements to complete the semester VI courses which are carried out for approximately 4 months in the field, namely the implementation starting from February 14, 2024 to June 14, 2024. To meet these requirements, the author and several fellow students conducted an Internship Work Practice . This Internship Work Practice activity was carried out at the PT Surya Multi Cemerlang ceramic factory, precisely at Jl. Raya Semambung No.296, Semambung-Wonoayu, Sidoarjo with PT Bangun Karya Perkasa Jaya Tbk as the Implementing Contractor. In connection with the many types of work on the Ceramic Factory Building Expansion Project (PT. Surya Multi Cemerlang) in Wonoayu, Sidoarjo, the types of work reviewed are limited to reviewing only the main activities, namely Floor Plate Work. One of the important structural elements in this project is the Floor Plate. As a structural element that functions as a place to support human and object loads, the Floor Plate is very influential in the planning and implementation of building construction. In its planning and implementation, the Floor Plate is designed as well and optimally as possible so as not to cause discomfort or danger. Improper planning and implementation of Floor Plate construction can cause cracks in one piece, which can affect the quality and durability of the floor plate. There are several students who review the implementation of other structural work from several areas being worked on by PT Bangun Karya Perkasa Jaya, such as reviewing the implementation of pile work, reviewing the implementation of Machine Foundation work, and reviewing the implementation of Wall work. Therefore, in the practical work that has been carried out, the author decided to analyze the method of "implementing Floor Plate work in the construction of a ceramic factory" in the field for writing the practical work report.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.