Abstract

Abstract : This report presents methods, results and conclusions from the reservoir system analysis of three U.S. Army Corps of Engineers (USACE) projects on the Iowa and Des Moines River system. A flood control linear programming model was developed and applied to perform the analysis. The objective of the study is to address questions related to flood control operating policies followed by the USACE Rock Island District. Another goal of the study is to assess the strengths and weaknesses of the linear programming model for this type of study.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.