Abstract

ABSTRACTRiver basin computer simulation studies often do not properly include the complex legal and institutional factors governing water allocation. These factors include formal water rights and informal borrowing agreements among the basin water users. An attempt has been made in this study to show that such factors can be included. We also show that an optimal, integrated approach to reservoir operations in a river basin can do much to alleviate the burden of new demands placed on available water resources. The procurement of a firm water supply for a proposed coal fired power plant is analyzed as a case study. An efficient river basin simulation model is used to determine the viability of a scheme for providing an annual firm water supply to the plant, with consideration of the existing water storage and demands within the basin. Given the hydrologic sequence considered, the model results show that the proposed strategy is viable in that the required firm water supply can be realized without causing harm to decreed water users in the basin. However, integrated diversion and reservoir operations are required to assure a desirable uniform rate of delivery of reusable effluent to the power plant.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.