Abstract

The tunnel of controller construction is located in Panton Bunot Village, Tiro Sub District, Pidie District, Aceh Province. The tunnel construction aims to flow the water from Kr. Tiro River to Rukoh inundation for water supply to Rukoh Dam in Keumala Sub District, Pidie District. The research aimed to comprehend engineering geological condition in the study area and determine excavation method at the inlet and proper tunnel support system. The determination of proper excavation method becomes crucial and it is required in maintaining affectivity and efficiency during tunnel construction process. Than excavation method determination is carried out calculation by using empirical method based on output parameter of laboratory test to the rock samples from core drilling in the tunnel track. The outputs are rock conditions as rock mass quality (RQD), discontinuity area density of the rock and rock stress strength. The condition of tunnel track was dominated by silt stone having very poor quality. UCS value was 3 Mpa – 10 Mpa. Joins spacing was less that 60 mm. Empirical analysis of excavation method explained that tunnel opening of Rukoh Controller Construction was highly weathered (HW) and required ripping as excavation type.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call