Abstract
Domestic and foreign practice of the construction project cost management are analyzed in the article. The technique, recommended for the international application No. 18R-97 is provided. The matrix for the classification of the cost estimates, including five classes of the assessment, provided by the technique, is offered. The algorithm of application of the budget standards during various stages of forming of construction cost of the project is offered.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Smetno-dogovornaya rabota v stroitel'stve (Estimated and contractual work in construction)
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.