Abstract

Operational performance in residential construction production systems is assessed based on measures such as average house-completion time, number of houses under construction, lead time, and customer service. These systems, however, are prone to nonuniformity and interruptions caused by a wide range of variables such as inclement weather conditions, accidents at worksites, fluctuations in demand for houses, and rework. The availability and capacity of resources therefore are not the sole measures for evaluating construction production systems capacity, especially when rework is involved. The writers’ aim is to investigate the effects of rework timeframe and frequency/length on tangible performance measures. Different call-back timeframes for rework and their impact on house-completion times are modeled and analyzed. Volume home-building was chosen as the industry sector studied in the research reported in this paper because it is a data-rich environment. The writers designed several experiments to model on time, late, and early call-back timeframes in the presence of rework with different length and frequency. Both mathematical modeling and discrete-event simulation were then used to compare and contrast outputs. The measurements showed that the average completion time is shorter in systems interrupted by frequent but short rework. In other words, a smaller downstream buffer between processes is required to avoid work starvation than those systems affected by infrequent but long interruptions. Early call-backs for rework can significantly increase the number of house completions over the long run. This indicates that there is an opportunity for the mass house-building sector to improve work practice and project delivery by effectively managing rework and its related variables. The research reported in this paper builds on the current body-of-knowledge by applying even-flow production theory to the analysis of rework in the residential construction sector, with the intention of ensuring minimal disruption to construction production process and improving productivity.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.