Abstract

Since a certain block was put into development, it has always put improving the injection production relationship and improving the ultimate recovery factor in the first place. Through a series of infill adjustment, supplement and extended drilling, the injection production relationship of single sand body has been gradually improved. In high water cut period, the remaining oil distribution has been quantified through joint multidisciplinary research, and the fluid production structure has been adjusted by combining the oil well injection, hole filling, drilling and other measures, Hard and stable production in high water cut stage is realized. However, due to the small scale of sand body development and fault development, the contradiction between single sand body injection and production is still prominent. From the perspective of development effect of Gaotaizi old area, compared with Xingnan development area, the degree of recovery at the same water bearing stage is obviously low, and the development effect is poor. At present, the comprehensive water cut has reached 92.77%, and the recovery percentage is only 28.05%. The research shall be based on the results of fine reservoir description, guided by the results of multidisciplinary research, and focus on the comprehensive analysis and sorting of the injection production relationship of single sand body through the re understanding of geology, so as to find the adjustment potential of supplement and injection conversion. Through the adjustment of the injection production system, increase the water injection well points, expand the swept volume, improve the degree of water drive control, so as to increase the formation pressure and improve the development effect of the block.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call