Abstract

Public projects in Saudi Arabia have been experiencing low construction project performance for the past decade. Studies have identified the low-bid delivery method as an important factor in causing such delays. In addition, low bids for contracts have not reflected the actual project cost. A case study was conducted at a university campus in northern Saudi Arabia in which the actual project costs for four projects were examined. The study found that all four projects’ costs were higher than the original bid. In addition, a large survey was conducted of 804 classified contractors and universities representatives who identified change orders as the most common factor causing cost overruns in Saudi Arabia. Previous studies showed that some contractors aim to submit low bids for winning the competition then change orders to reduce their losses. Consequently, low bids also lead to cost overruns. In a comparison using the result of a case study and the results of the Performance Information Procurement System (PIPS), Saudi Arabia’s delivery system was identified as a potential cause of project performance issues.

Highlights

Read more

Summary

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.