Abstract

Completion time of construction project that consist of many work items should not exceeds the given time requirement and the cost should not exceeds the planned budget. This study analyzed a work item that is floor ceramic installation by acquiring the comparison of labor productivity and the comparison of wage cost based on different labor compositions. Out of the three (3) studied labor compositions in floor ceramic installation, the composition that consist of 2(two) masons and 2(two) journeymen produces the highest productivity that is 1,73 m2 and based on the productivity the incurred wage cost, composition 2(two) is the cheapest with IDR. 9.046,-/m2.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.