Abstract

Longer lead time in small and medium enterprises results in direct impact on delivering the project at the stipulated time period, hence resulting in more costs involved. The reason for the delay in the lead time is because of the various ‘waste’ factors which can be analyzed by using Failure Mode Effective Analysis (FMEA). The paper discusses on the steps used in FMEA right from listing of potential failure modes to taking necessary actions in eliminating or reducing the high-risk failure modes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.