Abstract

The design of vertical formwork is governed by the lateral pressure exerted by fresh concrete; while maximum lateral pressure is the key parameter for formwork design, the rate of pressure decay and the time needed for pressure stabilization are important for determining formwork removal time.An analysis of different models for predicting the lateral pressure generated by SCC on vertical formwork was carried out, raising the issue of a fundamental parameter like the casting rate. The work also compiles experimental data published over 15 years. A total of 137 experimental data points were collected, 131 for SCC poured from the surface of the formwork and the remaining 6 for SCC pumped from the bottom of the formwork.Experimental data obtained from different authors were utilized in order to compare the adequacy of the different models in three zones: experimental data with casting rates under 3m/h, experimental data with casting rates between 3 and 10m/h, and experimental data with casting rates over 10m/h. The results were established by not only taking into account the three different zones, but also the formwork safety .

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.