Abstract
A large railway bridge is using (46.4 + 64 + 46.4) m double-line prestressed concrete continuous girder. In the construction process, bottom slab concrete in the mid span appears serious bursting crack phenomenon. Through the whole bridge stress analysis and closure segments locally fine finite element stress analysis, it appears tensile stress and large compressive stress in operational stage. Finally the bottom slab reinforcing schemes are proposed. It makes the following conclusions by analysis: (1) through the overall and local analysis stresses meeting the design requirements after reinforcement; (2) according to the domestic and foreign research experience, bursting crack reason of bottom slab is that prestressed pipes deviation from the design positions and anti-collapse steel bars are not set in place.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.