Abstract

Abstract A preliminary study shows that the flanges in a typical bolted joint for piping have a more nearly uniform, and hence more favorable, stress distribution after creep has occurred than when the joint is first tightened up. However, the tightness of the joint depends on the initial elastic stretch of bolts and flanges; hence an estimation of its durability at high temperature is really a compound relaxation problem, and the advantage to be gained by the quasi-uniform stress distribution is apt to be illusory.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.