Abstract
Abstract : A definitive set of test requirements are developed for the U.S. Army evaluation of the Microwave Landing System (MLS). The approach taken in to (1) access the Army operational requirements for an aircraft landing system in the 1980-1990 era, (2) compare the 1980-1990 operational requirements to the FAA engineering requirements for the tactical MLS configuration, (3) recommend specific tests to be made by the Army during the MLS Phase-3 evaluation, and (4) review of five computer models for suitability to calculate MLS guidance accuracy in a multipath propagations environment.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.