Abstract

The article deals with a method of simulation modeling, that takes into account the peculiarities of its use in the conditions of a frame-monolithic building erection. The method of simulation modeling is developed. The essence of this method is in usage a Monte Carlo method for performing one work and construction of the entire object for a two-factor beta distribution. The empirical regularities that characterize the duration of individual works anderection stages of a frame-monolithic building are obtained.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.