Abstract

This paper presents both steady-state performance and dynamic simulations of a commercial wind farm (WF) in Taiwan through field measurement results and computer simulations. The companion paper in Part II discusses the dynamic and transient analyzed results of using current-limit reactors (CLRs) and load tap changers on power-quality improvement of the studied WF. With 23 2-MW DFIG-type wind turbine generators, this WF is connected to the 161-kV extra high-voltage substation of Taiwan Power System through a 23/161-kV 60-MVA step-up main transformer from six feeders with CLRs. Through comparing field measured results, this paper establishes a simulation model to simulate and analyze the steady-state and dynamic characteristics of the studied WF which is subject to disturbance conditions under different wind-speed conditions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.