Abstract

Aimed to solve the problem that the reasonable finished state (RFS) of space-twisting cable leaning tower cable-stayed bridge (SLCSB) is inconsistence with actual finished state. The numerical analysis and field test methods are used. Firstly, based on comprehensive studying of the interaction between influencing factors of the finished state and construction state, analysis methods of coupling RFS and rational construction state (RCS) are proposed with the thought of construction process control implanting into design stage. Secondly, a main span of 220m SLCSB is used as example, the coupling analysis method proposed in the paper was proved. Finally, with some data measured from actual project, it shows that: this method can ensure the cable tension, the main beam and the main tower bending moments forming RFS at the same time, while the problems of the inconsistency between RFS and one-step bridge status is solved.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.