Abstract

According to the geological conditions of upstream cofferdam and foundation of the hydropower station, analysis for the seepage of the upstream cofferdam used SEEP/W module of Geo-studio software. Analysis for the stability used SLOPE/W module with Swedish circle method and Bishop method. Safety factor of the upstream and downstream in different conditions was obtained. The results show that the design of the upstream cofferdam was reasonable, and it will provide theoretical basis for Seepage control design of cofferdam.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.