Abstract

The type of contract for the road project used in PT Pelabuhan Indonesia III (Persero) is currently using the type of General Contracting. The contract is conventional and is considered to have many weaknesses. To obtain more optimal project results and maintenance can run optimally, in addition to improving quality control by the project supervisory team, one way that can be done is to change the use of innovative types of contracts. namely Performance Based Contracts (PBC). When implementing the PBC for the first time, there are several things that must be prepared, one of which is the readiness of the owner and contractor. Analysis in this study uses Structural Equation Modeling (SEM). The results obtained are that the variable readiness to use PBC has a positive effect on the application of PBC. If the readiness variable increases by one unit and the other variables are considered constant then the PBC implementation variable will increase by 0.390.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.