Abstract

With the development of modern technology and space, more and more cities begin exploit underground space, to satisfy the increasingly crowded environment. This article base on double-decked electric power tunnel of 220KV II cut change project, use the finite element software MIDAS/GTS analysis and simulation the project construction process of two different method, through all the simulation of construction process, and analysis the engineering the feasibility construction method. It is the first time use the double-decked tunnel construction methods in Beijing, to discuss and analysis the method of the project have an important significance, in the meanwhile, it can provide some references to similar project construction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.