Abstract

Based on an engineering example of intrusion-clearance of diaphragm wall, the mechanism and effect factors of intrusion-clearance are discussed by monitoring data and numerical analysis. The research result shows that the deviation of diaphragm wall, bad quality of improved soil and insufficient outward-moving of diaphragm wall cooperatively lead to intrusion-clearance, and the first has a significant effect. Moreover, dewatering of foundation pit also cause deformation of diaphragm wall, which accounts for more than 25% of the deformation during excavation, but usually despised in construction. The improving effect of reinforced soil attributes more to the deformation of diaphragm wall, especially the area closed to diaphragm wall. Some remedies and precautions are also given in this article, which could provide references of design and construction for similar projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.