Abstract

Several instrument tubes vibrated during the C stage commissioning period of a PWR nuclear power plant. This essay firstly analyzed the selection of instrument tubes and the velocity of the tubes vibration. Moreover, the author proposed solution towards the tubes vibration which was proved to be effective after applying on the nuclear power plant instrument tubes. The method proposed should be applicable when similar situation reoccurred in other plants.

Highlights

  • Thermal instruments are important parts of the nuclear power plant automation system and key to ensuring the safety of nuclear power plant operation

  • During the C stage commissioning period of a domestic pressurized water reactor nuclear power plant, the vibration did not raise the risk of fatigue fracture, the instrument tubes vibrated several times within the range of the conventional island

  • Since the instruments are responsible for monitoring the status of the units and some are directly affecting the operating status of the nuclear island and conventional island, the fatigue fraction caused by instrument tubes vibration may lead to unplanned trips or reactor jumps of the unit, and this could lower the safety and economic benefit

Read more

Summary

Introduction

Thermal instruments are important parts of the nuclear power plant automation system and key to ensuring the safety of nuclear power plant operation. During the C stage commissioning period of a domestic pressurized water reactor nuclear power plant, the vibration did not raise the risk of fatigue fracture, the instrument tubes vibrated several times within the range of the conventional island. Since the instruments are responsible for monitoring the status of the units and some are directly affecting the operating status of the nuclear island and conventional island, the fatigue fraction caused by instrument tubes vibration may lead to unplanned trips or reactor jumps of the unit, and this could lower the safety and economic benefit. Since the instrument pipe itself was long and flexible, when the stress hit its highest, there should appear cracks at first and lead to fatigue fracture if no support was provided to fix the tubes[1]

Methods
Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.