Abstract

The 500kV UPFC demonstration project of Jiangsu Suzhou south grid was put into operation in December 19, 2017. Depending on the State Grid science and technology project “Study on control and protect coordination of 500kV UPFC” and according to the system operation mode and equipment parameters provided by the relevant institutes, the authors had researched on electromagnetic transient modelling and simulation of 500kV Suzhou south grid and 500kV UPFC in earlier period. In this paper, the theoretical analysis and simulation verification of several typical faults in 500kV UPFC station are carried out by using the above model, which is an important part of the project.