Abstract
The thermodynamics and kinetics factors about ladle vanadium extraction are introduced firstly. According to the real production in the resources comprehensive utilization test pilot of Pangang, the causes of temperature controlling, shortage of oxygen supply as well as the difficult for slag skimming are all analyzed in detail and the solutions are put forward at the same time. Under the real production conditions, if controlling the temperature of molten pool between 1450~1500°C,keeping the bottom blowing smoothly, meeting the oxygen supply of 1400 Nm3/h and adding adequate coolant at better time it will get good vanadium extraction results
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.