Abstract

Some motor assembly enterprises manage production site according to experience, which causing process was not scientific and lower efficiency. Through researching for a motor assembly production field, analyzed and improved the process and site layout using industrial engineering method such as 5W1H and ECRS etc., optimized layout of store, reduced processing and transportation 2 times each, canceled unnecessary wait, saved transportation distance 20.6m, reduced production cycle 8.1 min, at the same time, the site operators was decreased through the reasonable allocation, greatly increased the production efficiency, make the management more scientific and reasonable.