Abstract
The attractiveness of tourist facilities is based, among other things, on the continuous expansion of their offer. In the case of the underground mining facility, this will involve making new workings available for tours. To this end, analyses were carried out on the existing ventilation network, a model of the network was made and adapted to the future situation. In order to ventilate the new excavations, a new fan station, and a large diameter borehole were designed. Phases Ia, Ib, II and III of the changes to the ventilation network with a view to opening up a new chamber are presented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have