Abstract
Standing at the perspective of the project management, this thesis, from the relation between schedule, quality and cost, analyzes how the project cost was influenced by the schedule risk and quality risk, assesses the total cost risk of the project with artificial neural network BP algorithm, and determines the most sensitive factors of the project cost risk, which could provide reference for the project managers to control the project cost risk.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.