Abstract

Combined with the settlement observation data in soft soil foundation test section of highway projects, the final settlement of soft soil foundation by preloading was calculated by using three-point method, Asaoka method and hyperbola method, and the comparative analysis on the final settlement and post-construction settlement of soft soil foundation were conducted by various calculation methods, then the suitability of calculation methods for post-construction settlement of highway soft soil foundation was discussed. And the results are shown as follows: (1) The final settlement results calculated by three-point method and Asaoka method were less than hyperbolic method, due to only considering the primary consolidation settlement for the first two methods; the calculation results of three methods were close to each other when the secondary consolidation settlement was considered, and the secondary consolidation settlement should be considered when the post-construction settlement was calculated by the first two methods. (2) The post-construction settlement and differential settlement of soft soil foundation test section of highway calculated by three methods were all satisfied with the design requirements.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.