Abstract

To explore the migration differences of sediments at the front, middle, and end sections of a storm sewer when scoured by water, and further evaluate the pollution load, the scouring process of sediments at different locations of a storm sewer was simulated and mathematical models were built to calculate the scouring rate. Results show that scouring rate is affected by sediment particle size, pipeline slope, sediment thickness, and water flow velocity. As the slope increased, scouring rate at the end section increased more obviously. The scouring rate at the front section slightly decreased with increasing sediment thickness, but opposite trends were observed at the middle and end sections. When the particle size (0.33 mm-0.83 mm) and flow velocity (0.15 m/s-0.65 m/s) increased within their ranges, scouring rate increased across all three locations. Models for calculating scouring rate were established via two data fitting. The calculated values were compared with measured values at a scouring time of 1 min. Under different particle sizes, the difference between the calculated and measured values at front, middle, and end sections were in the ranges of -0.63% to 0.63%, -0.01% to 0.02%, and -0.13% to 0.16%, respectively, all of which showed good consistency.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call