Abstract

The hydromorphological situation at the site of bridge construction is analyzed in the paper; the analysis results are presented. The issues of ensuring the channel geometry stability are considered. The impact of a temporary construction embankment on the f low kinematics is estimated. The level regime of the river and the channel reformations in the alignment of the bridge crossing and on the upstream section of the river are studied at the calculated level and water flow. The results obtained make it possible to determine and establish the values of the permissible degree of impact of the designed hydraulic structures and measures on the channel regime of the near-mouth section of the Zeya River in the area of the projected bridge crossing over the river in Blagoveshchensk, within which the natural and anthropogenic-induced conditions of the statistical stability of the “flow-moving channel” system are realized by the river flow. The studies were carried out in 2 stages: the first one, a test stage, was carried out for the initial everyday state of the riverbed in the section of the Zeya River in the area of the bridge crossing, according to which the model was calibrated in accordance with the specified boundary conditions in the area under study; the second one, on the model, was carried out for three options of the construction dam length, erected from the left bank to the 15th pillar of the bridge, to the middle of the span between the 15th and 16th pillars and up to the 16th pillar of the bridge crossing, which made it possible to assess the impact of the structure with different options of its length on the flow hydraulics in the area of the bridge crossing. The research method applied is the mathematical 2-D modeling of the water movement characteristics, for which the “FLOOD” software package is used.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call