Abstract
AbstractWe consider a network of periodically running railway lines. Investments are possible to increase the speed and to improve the synchronisation of trains. The model also includes random delays of trains and the propagation of delays across the network. We derive a cost‐benefit analysis of investments, where the benefit is measured in reduced waiting time for passengers changing lines. We also estimate the actual mean waiting time simulating the train delays. This allows us to analyse the impact that an increasing synchronisation of the timetable has on its stability. Simulation is based on an analytical model obtained from queueing theory. We use sophisticated adaptive evolutionary algorithms, which send off avant‐garde solutions from time to time to speed up the optimisation process. As there is a high correlation between scheduled and estimated waiting times for badly synchronised timetables, we are even able to include the time consuming simulation into our optimisation runs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Transactions in Operational Research
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.