Abstract

A case study on the measurement of lateral movement of an abutment supported by pile groups constructed in a cohesive soil is reported in this paper. Based on prediction at the design stage and observational construction control, the abutment was successfully constructed within the range of allowable lateral movement. After the completion of construction, the 3D elasto-plastic coupled FE analysis based on the Cam-clay model was applied to the problem. Although the analysis overpredicted the lateral movement, it was indicated that such analysis is useful for evaluating the mechanism of lateral movement of such an abutment and the effect of the weak surface soil, replaced by more “competent” material.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.