Abstract

The paper deals with the runway capacity analysis at Airport Konstantin the Great in Niš. Runway capacity with the current infrastructure (Scenario 1) is estimated and compared to runway capacity after the parallel taxiway is introduced (Scenario 2). This paper is motivated by the current development of Nis Airport infrastructure that, among others, includes taxiway system improvements.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call