Abstract

Lumpo Service Unit is one of the clean water service units in PDAM Tirta Langkisau, Pesisir Selatan Regency, which serves parts of IV Jurai District. The Lumpo Service Unit currently has a production capacity of 3 l/sec or still 24% of the total served population and a fairly high water loss rate (35% or 2,671 m 3 ). This study aims to analyze the clean water needs of the community in the Lumpo Unit area from 2021 and 2025 and analyze the condition of the clean water distribution network system in the Lumpo Service Unit in 2021 and 2025. Analysis of the water distribution system network was carried out using Epanet 2.0. It was found that the water demand in 2021 was 5.45 l/s (22.51 l/s at a service level of 100%) and there was an increase in 2025, namely 28.23 l/s. Analysis of the piping distribution network in 2025 shows that 27 out of a total of 49 junctions have water pressure below the minimum limit for distribution pipe criteria from PERMEN PU No. 18/PRT/M/2007, as well as 13 out of 50 total pipes with water flow rates below the minimum limit of the same criteria of 0.3 m/s.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.