Abstract
<p>PT IGASAR was one of the companies affiliated with PT Semen Padang with business activities in the fields of engineering, cement distribution, transportation, heavy equipment rental, cement-based building materials industry, manufacturing, general contractor, and developer. Some work accidents were still found in activities at this company. It was essential to making hazard identification, risk assessment, and determined the type of control in some areas. There are work accidents in PT IGASAR in as many as five cases in 2017 - 2018. One way was to use the Hazard Identification Risk Assessment Determine Control (HIRADC) Method. A risk analysis was done by looking at the opportunities and the severity of the hazards. Based on the results of the risk analysis, it was found that activities that were low risk, very high risk was absent while the medium risk was 100%. The risk control measures include the provision of personal protective equipment, the rule of safety signs, equipment maintenance, and the creation of road area boundaries.</p>
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.